Post Category → Magayon II
Papaya Cove – Repairs
Before Miriam left for her boatbuilding course at the Boatbuilding Academy in the UK, we planned to do some repairs. The first thing to do was sailing Magayon II from Puerto Galera to the boat yards in Papaya Cove.
Continue readingMini Magayon II
Magayon II als 1:12 Modell
Wir haben vor ca. 14 Jahren in den Philippinen angefangen einen Wharram Tiki 26 zu bauen. Bauzeit waren mehr als 6 Jahre.
Continue readingProtected: Follow Magayon II
Sail to Pandan: Finished renovating Magayon II’s trailer
Magayon II’s roadworthy trailer was after 8 years quite rotten. The wooden floor and sidewalls needed to be re-done. Ants had nested in the lights and spoiled them. We needed to fix it before being able to sail to Pandan or participate in the PGYC Easter Regatta. Continue reading
Sail to Pandan: Kinder betet, Vater lötet
Fixing the electrics before the new floor for the trailer is fitted.
Sail to Pandan: Mounting the Ladder
A Merms Video.
Sail to Pandan: Varnishing boat stands
Merms: “Varnishing some wood. Ah, the sweet smell of brain damage in the morning.”
Sail to Pandan: Yet another long boat working weekend
Long weekend in Santa Maria. See Link for more photos.
Sail to Pandan: Installing Canvas Seats – TIKI 26
This is an experiment. The old canvas seats have a lot of disadvantages. Continue reading